skip to Main Content

Silent Unity

PROJECT NAME: Silent Unity

YEAR: 2021

INDUSTRY: Non-Profit

GC: Silent Unity

ARCHITECT: Gastinger Walker

INSTALLATION COMPANY:  MSI

Falkbuilt Kansas City was selected by the client and architect to update a historical building on the Unity Village campus.  We were excited to be a part of this project and watch the transition unfold of this beautiful building.  The 6,800 square foot third floor installation was completed in a grand total of 6 DAYS! This project consisted of multiple offices and a beautiful training room that can double as a conference room. Solid walls are wrapped in a luxurious Falkskin with writable surfaces throughout. Glass fronts provide a clean fresh look allowing plenty of light to pass through. The client chose to add integrated technology to promote collaboration. In conventional construction, this project could take a month or more to install. But with the incredible speed of Digital Component Construction, we wrapped this up in just days—with virtually no waste onsite.  We are anxious to get started on the second floor!

Back To Top